Skip to content

Short Tasks Inside Shifts

A short task is work of one skill that takes an hour or two and is done by someone who is already at work, inside their ordinary shift โ€” for example packing 08:00โ€“10:00, after which the employee goes on with their own work. The task is never a shift of its own: the employee keeps their normal shift and hours, and spends part of it on the task.


How it works

A short task is defined by a shift template marked Short task inside another shift, together with the skills it stands for.

When Smart Schedule runs:

  1. Demand (a need) of one of the template's skills that lies entirely within the template's time becomes a short task. A need that reaches past the template's time stays ordinary demand and is planned as shifts.
  2. The scheduler never hands the template out as a shift. It plans the ordinary shifts first.
  3. Each task then goes to an employee who

    • holds the task's skill,
    • works a shift that covers the whole task (a shift starting at 09:00 cannot take packing 08:00โ€“10:00), and
    • does no other short task at that time.

    On-call (Emergency) shifts never take a task. When several employees qualify, the tasks are spread among them. 4. If the need asks for two people, two different employees get the task.

The task adds no hours. A packer working 08:00โ€“16:30 who packs from 08:00 to 10:00 still works 8.5 hours โ€” the task is part of that shift.


1. Create the task template

  1. Go to Settings > Configuration > Shifts and click New Shift.
  2. Fill in the shift details for the task's time:
    • Shift Type Name โ€” e.g. "Packing"
    • Abbreviation โ€” e.g. "PCK"
    • Shifts Start and Length โ€” when the task happens, e.g. 08:00 and 2 h
    • Days, Color / Background as for any other shift (the colour is used for the task in the schedule)
  3. Turn on Short task inside another shift.
  4. In Skills of the task, select the skills whose demand this template stands for โ€” e.g. "Packing".
  5. Click Save.

Note

The skills are required: templates have no skill of their own, so without them the switch would decide nothing. A template can't be both a short task and an on-call (Emergency) shift.


2. Assign the template to the workplace

  1. Go to Settings > Configuration > Workplaces and open the workplace.
  2. In the Shifts tab, add the task template.
  3. Save.

3. Define the need

Create the need for the task's skill as usual (see Needs) โ€” for example Packing, 08:00โ€“10:00, 1 person, Mondayโ€“Friday. The need's time must fit inside the template's time; the number of people is taken from the need.


4. Generate the schedule

  1. Open the schedule detail and click Smart Schedule.
  2. In the day view, the task is shown as a band at the bottom of the host shift, in the task template's colour. Hover over it to see the task and its time.

Coverage follows what the employee is doing: during the task they count for the task's skill, the rest of the shift for the shift's own skills โ€” never for both at once. That is why the host's own skill can show a shortfall while the task runs.

When nobody can do the task

If no employee with the skill works a shift that covers the whole task, the task stays in the schedule without a person. The Schedule Plan Issues dialog (right panel) lists it under Short tasks without a person, with the task and its day.


Manual changes

A short task belongs to its day and time, not to the shift that does it. It therefore never moves together with the shift.

Changing, moving or removing a shift

When you move a shift to another day, change its time so it no longer covers the task, give it to an employee without the skill, or remove it, the task is left without a person and the Short task left without a person dialog opens:

  1. For each task, the dialog offers the shifts that day which meet the task's need. The best one is preselected.
  2. Pick a shift and click Confirm, or choose Leave without a person.
  3. Cancel keeps your change to the shift and leaves the task without a person (it is then listed in Schedule Plan Issues).

When a swap from the shift marketplace or approved time off takes a task's shift away, the task goes straight to the next employee who can do it โ€” or stays without a person if there is none.

Assigning a task by hand

  1. Open the shift's menu (โ‹ฎ) and choose Assign short taskโ€ฆ.
  2. The dialog lists the tasks of that day this shift can take โ€” those without a person and those someone else does now.
  3. Select a task and click Confirm. The task moves to this shift.

Fill gaps

Fill gaps also fills in short tasks: tasks without a person go to someone who can do them, and tasks someone already does stay with them. It does this even when the schedule has no unassigned shifts.


Worked hours and payroll

Short tasks don't change hours: funds, contract limits and payroll exports count the host shift only.


Notes

  • Adherence measures the agent against the task while it runs. The per-skill hours report, exports and Google Calendar show the host shift, not the task.
  • A task is placed by the shift's start and end; breaks inside the host shift are not taken into account.
  • An employee allowed to work only the task template gets no shifts from it โ€” the template is never a shift. Allow them their ordinary shifts as well.