Přeskočit obsah

Average Duration

Overview

This documentation page describes the Average Duration report feature within Daktela WFM. The report allows users to view and compare schedule metrics.

Key Functionality

According to the page, users can "select a specific Schedule plan to display its Average and Real duration" via a dropdown menu located in the top right corner of the interface.

Page Location

This report is accessible within the WFM system's reports section: - Path: Work Force Management > Reports > Average Duration

The Average Duration report exists alongside other planning and reporting features: - Coverage/Require - Predicted Time - Predicted Operators

Technical Note

The page includes JavaScript functionality for managing UI elements and navigation state persistence, but these are implementation details rather than functional documentation content.


Note: The provided content was minimal; the page title and basic feature description constitute the primary documentation content available.